Water treatment project-how much budget do you need to build a swimming pool

Our customer service often receives message like this: How much does it cost to build a swimming pool? This makes it difficult for our customer service to answer. This is because building a swimming pool is a systematic project, not as I imagined that I have a place, dig a pit and build it. Click the bricks, connect a few pipes, and add a few pumps. If you do this, your swimming pool may sink and crack in less than one swimming season. From a leak, to a serious threat to the safety of swimmers, your investment will be wasted. The above is the real situation of one of our customers.
Let’s first introduce how the swimming pool is built.
First, you need to have a place, and then you find a construction company to inform the construction company in detail about the shape, specifications and ground facilities (such as changing rooms, toilets, etc.) of the swimming pool you want to build, and let the construction company help you design and budget, and finally Give your architectural design drawing to a swimming pool equipment company like us, and we will redesign the circulation pipeline diagram, circulation equipment diagram, circuit diagram, etc. on your architectural drawing, and give you feedback on the space required for the computer room according to the equipment (you need to report this space) Let the construction company do as required). After you agree with the plan, we will give you a detailed quotation.
Therefore, the amount of money needed to build a swimming pool can be summarized into three aspects: one is the money for the land, the other is the money for the construction, and the third is the money for the recycling equipment. Therefore, before building a swimming pool, it is recommended that you first understand the budget of each of the above items (if there is no design drawing, it can only be a very rough estimate, and there may be large errors). If it does not exceed your total investment budget, Then you can implement it.
The swimming pool circulation equipment project mainly includes: pipes, circulating water pumps, filter sand tanks, automatic monitoring and dosing systems, heating equipment, power distribution, etc. Therefore, without architectural design drawings, we can’t count the pipes at all, and whether underwater lights are needed Waiting involves the cost of wires. Therefore, if there is no drawing and the equipment is not specifically determined, our estimates will vary greatly. Here we use the following two pools as a reference.

Standard swimming pool (50×25×1.5m=1875m3): no heating, light, ozone system
The estimated price of the recycling equipment project is about 100000usd. (5 sets  15-hp water pumps, 4 sets 1.6-meter sand filter, with automatic monitoring dosing system)

Half a standard pool (25×12×1.5m=450 cubic meters): no heating, light, ozone system
The estimated price of the recycling equipment project is about 50000usd. (4 sets  3.5-hp water pumps, 3 sets 1.2-meter sand filter, with automatic monitoring dosing system)

sa

 


Post time: Jun-24-2021


Send your message to us: